ONRR OGOR Days Produced Method
The ONRR OGOR Days Produced Method is used to determine the number of days a well actively produced during a reporting month, specifically for OGOR (Oil and Gas Operations Report) submissions to the Office of Natural Resources Revenue (ONRR).
This method ensures accurate allocation and compliance by tracking actual production days per well. It plays a key role in monthly reporting and directly impacts volume allocation, royalty calculations, and system validation.
The methods can be found in Production Reporting → OGOR Product Mappings → ONRR OGOR Properties

The application decides the number of days depending on the method chosen for that asset. Currently, we have two possible ways it can count: Allocated Flow Hours and Well Status.
if it’s Allocated Flow Hours, the system checks the flow hours recorded for this specific meter, asset, and date. It tries to find a record for that specific combo and, if it finds it, it returns the number of days; otherwise, it returns 0.
On the other hand, if the method is Well Status, the system checks if the well connected to this meter was active. So, if there’s a well connected, and it should use that well’s info, it gets the well's ID and looks up how many days that well was working. If not, it just checks how many days the meter (or anchor) was working.
📘 Instructions
Steps to adjust this property:
Select the correct Asset.
Select the Days Produced Method.

Select the Operator Well Number Source

This field allows the user to select whether they want Well Number or Well Name on the export file.
Click on Save to apply the changes.

Similar Tickets:
WEMAIN-729