Skip to main content
Skip table of contents

Tie Out testing Guidelines

  1. Preferrable and recommended Prod dates for Tie out testing are March or April as we will have EOY tariffs, rates, escalations to be evaluated.

  2. After receiving both the boxes, make sure the data is available in all screens both the boxes to make sure there is not data loss after migrations (ex: Owner amounts, Owner release/suspension LIOs, Units table under Run tickets)

  3. Please make sure the configs are cross checked as per previous clients done for Tie outs Configuration changes done for Exxon Unity Go live

  4. Start uploading the data after format correction.

  5. Take the back up of clone and project boxes after uploads done.

  6. Create the tracker in the shared path as per template https://wenergysoftwarecom.sharepoint.com/:x:/r/sites/MidstreamAndTransportation/_layouts/15/doc2.aspx?sourcedoc=%7BA06EDDE1-836A-4060-A4BA-05F989A034F7%7D&file=Release%2024.2%20progress%20tracker.xlsx&action=default&mobileredirect=true

  7. Update the tracker according to the jobs passed with version on which the screen is passed.

  8. Make sure adding the EPIC in the QA test bugs found during tie out testing.

  9. Create a confluence page for the config and settings changes done as part of migration in unity.

  10. Run the tie outs for all the assets in the company.

  11. Run process where a bug is fixed for all the assets (though they passed earlier) to check regression.

  12. Do not share the box with any one impacting tie out data.

  13. Always test on the latest version and deploy the same every morning at the start of the day stashing the unmerged code.

  14. Cross verify all the columns names, data gaps across the boxes for respective screen before or after running the compare tool. Compare tool will not compare all the columns hence make sure manually we check the data.

  15. Take the back up of both boxes (delete the back up taken earlier) once all the assets are tied out.

  16. Any process can be marked PASS only after Automation report says no out of tolerance and manually verify the column, row count and summations.

  17. Make sure at least 2 assets are tested for PPA timeline after closing the Main Time line.

  18. PPA Tie outs has to be done on closed Prod date by updating Run ticket volume or Rates/prices for the respective prod date.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.