Skip to main content
Skip table of contents

Missing Leveled Volumes for New Meter

🤔 Problem

The client recently created two new meters required for a PPA. After everything was set up, no allocation results were generated, and there were no warnings indicating why the volumes were not picked up. Additionally, no leveled volumes were produced when data preparation was executed.

🌱 Solution

Upon reviewing the setups for the meters, asset configuration, and allocation setups, it was found that no leveled volumes were being created.

  1. Verify that the meter is effective for the dates being processed.

  2. Confirm that there are volumes and analysis for the meter for the required production date.

  3. After examining the volumes, it was determined that a frequency had not been set on the volume. The frequency must be configured to Day or Month, depending on the volume type.

After adding the frequency to the volume and re-running data preparation, no leveled volumes were generated.

image-20250804-151414.png

📎 Related Ticket

WESS-16391

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.